-- card: 100883 from stack: in -- bmap block id: 0 -- flags: 0000 -- background id: 3633 -- name: With Actual Dates -- part 29 (field) -- low flags: 01 -- high flags: 0000 -- rect: left=241 top=56 right=84 bottom=463 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 0 -- font id: 3 -- text size: 10 -- style flags: 256 -- line height: 13 -- part name: subhead -- part 32 (field) -- low flags: 01 -- high flags: 0002 -- rect: left=409 top=260 right=275 bottom=464 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: pagexofy -- part 33 (button) -- low flags: 00 -- high flags: A003 -- rect: left=15 top=182 right=203 bottom=210 -- title width / last selected line: 0 -- icon id / first selected line: 0 / 0 -- text alignment: 1 -- font id: 3 -- text size: 10 -- style flags: 0 -- line height: 13 -- part name: Calculating Project Dates ----- HyperTalk script ----- on mouseUp go card id 91353 end mouseUp -- part contents for background part 6 ----- text ----- Once your project is under way and you start entering actual data, you should ordinarily calculate with actual dates. When Calculate Using Actual is on, MacProject II uses the schedule’s actual dates to determine late dates, critical path, slack times, and resource durations. -- part contents for background part 7 ----- text ----- Choose Calculate Using Actual from the Dates menu. For calculating late dates with actual dates, MacProject II assigns the last task’s Actual Finish to be its Latest Finish and takes a backward pass through the schedule to determine the rest of the late dates. -- part contents for background part 27 ----- text ----- Recalculating the Schedule -- part contents for background part 28 ----- text ----- With Actual Dates -- part contents for card part 29 ----- text ----- To change to calculation with actual dates: -- part contents for card part 32 ----- text ----- 1 of 2